Toshiba RAS-10GAVP-E Air Conditioner User Manual


 
96
No.
Part name
Compressor
Procedure
1) Perform work of item 1 of
and
,
,
,
.
2) Extract refrigerant gas.
3) Remove the partition board.
(ST1TØ4 × 8L 3 pcs.)
4) Remove the sound-insulation material.
5) Remove terminal cover of the compressor,
and disconnect lead wire of the compressor
from the terminal.
6) Remove pipe connected to the compressor
with a burner.
Take care to keep the 4-way valve away
from naked flames. (Otherwise, it may
malfunction.)
7) Remove the fixing screw of the bottom plate
and heat exchanger. (ST1TØ4 × 8L 1 pc.)
8) Remove the fixing screw of the bottom plate
and valve fixing plate.
(ST1TØ4 × 8L 1 pc.)
9) Pull upward the refrigeration cycle.
10) Remove BOLT (3 pcs.) fixing the compres-
sor to the bottom plate.
* Precautions when assembling the com-
pressor.
Tighten the compressor bolts using a
tightening torque of 4.9 Nm.
Remarks
Reactor 1) Perform work of item 1 of
, and
.
2) Remove screws fixing the reactor.
(ST1TØ4 × 8L 4 pcs.)
Valve
fixing
plate
Compressor
Partition
board
Reactor