![](http://pdfasset.owneriq.net/1/bb/1bb9adcb-7c0d-4e3d-98de-59a3010ec696/1bb9adcb-7c0d-4e3d-98de-59a3010ec696-bg21.png)
All installations and services must be performed by qualified service personnel.
27
4. BLOWER AND CONTROL PANEL WIRING
Figure 21
: TURN OFF THE ELECTRICAL POWER to the furnace before attempting to disconnect
blower wiring.
DIP SWITCH (S1):
HEAT “OFF” DELAY
SW1 SW2 SECS.
ON
OFF
*ON
OFF
ON
ON
OFF
OFF
60 SEC.
90 SEC.
120 SEC.
180 SEC.
2
ND
STAGE DELAY FOR SINGLE STAGE
THERMOSTATS
SW3 MINUTES
OFF
*ON
5 MIN.
10 MIN.
*Factory Setting