14
TDVDSN Series Direct Vent Gas Fireplace
20007890
STEP 6
Use appropriate length of pipe sections - telescopic or
fixed - and install the horizontal vent sections. The sec
-
tions which go through the wall are packaged with the
starter kit, and can be cut to suit if necessary. (Fig. 19)
Sealing vent pipe and firestop gaps with
high temperature sealant will restrict cold
air being drawn in around fireplace.
Noncombustible Walls:
(Fig. 17) Hole opening must
be 7¹⁄₂” (190 mm) in diameter.
STEP 2
Measure wall thickness and cut zero clearance sleeve
parts to proper length (MAXIMUM 12”/305 mm). As
-
semble sleeve and attach to firestop with #8 sheet
metal screws (supplied). Install firestop assembly. (Fig.
16)
Zero clearance sleeve is only required for
combustible walls.
X
FP1240
Fig. 17 Vertical height requirement.
X
FP1241
Fig. 18 Horizontal length requirement.
ZCS101
Zero Clearance Sleeve
3/11/99 djt
Max. Length
12” (305mm)
#8 Screws (2)
#8 Screws
(2)
Adjustable
Zero Clearance
Sleeve
#8 Screws
(2)
Adjustable Zero Clearance Sleeve
ZCS101
Fig. 16 Adjustable zero clearance sleeve.
Firestop
VO584-100
Vent Opening
2/99 djt
Vent Opening for Combustible Wall
9³⁄₈”
(240mm)
9³⁄₈”
(240mm)
Fireplace Hearth
Framing
Detail
Opening for Noncombustible Wall
7¹⁄₂”
(190mm)
VO584-100
Fig. 15 Locate vent opening on wall.
STEP 3
Place fireplace into position. (Fig. 17) Measure the ver
-
tical height (X) required from the base of the flue collars
to the center of the wall opening.
STEP 4
Apply a bead of high temperature sealant to the inner
and outer flue collars of the fireplace and using ap-
propriate venting component(s) attach to fireplace with
three (3) screws. (Fig. 18) Follow with the installation
of the inner and outer elbow. Again secure joints with
three (3) sheet metal screws. Wipe off any excess high
temperature sealant.
STEP 5
Measure the horizontal length requirement including
a 2” (51 mm) overlap, ie from the elbow to the outside
wall face plus 2” (51 mm) (or the distance required if
installing a second 90° elbow). (Fig. 18)
Always install horizontal venting on a level
plane.