Sterling stt 1600 Dehumidifier User Manual


 
Ob serve that the dry ing cells must be filled with dry ing agent be fore setting-up the dryer (only
STT 1600, STT 2400). This will pre vent dam age of ma te rial!
Check 5 hours af ter first putt ing into op er a tion that the dry ing cells are sufficently filled with dry ing
agent (only STT 1600, STT 2400). This will pre vent dam age of ma te rial!
036-2MS
De hu mi di fied Air Dry er
Sa fe ty in struc tions 2-6