7.1. Tran sport and Pac king
»
Plea se en su re ade qua te car ry ing ca pa ci ty of the lif ting equip ment.
The equip ment pass a ri go rous ope ra ting test in the fac to ry and are pa cked ca re ful ly to avoid
trans port da ma ge.
Plea se check pac king on de li very for trans port da ma ge.
The in let and disch ar ge flan ges are sea led with plugs, so that no dirt can en ter du ring trans port.
Plugs must be re mo ved be fo re as sem bly.
Pac king ma te ri als should be dis po sed of ac cor ding to en vi ron men tal laws or reu sed.
Only use for trans port of the equip ment a suit ab le lif ting de vi ce (e. g. a fork lift truck or a work shop
cra ne).
For trans port of con trol ca bi nets fas ten the trans port ca bles to the eye lets of the con trol ca bi nets
Trans port must be shock-proo fed and free from vi brat ions.
7.2. As sem bly
»
Plea se en su re ade qua te car ry ing ca pa ci ty of the lif ting equip ment.
Check the car ry ing ca pa ci ty of the point of in stal la ti on, par ti cu lar ly if in stal led
on a plat form.
The pla ce se lec ted for in stal la ti on should be as free of vi brat ions as pos si ble.
The main switch must be free ly ac ces si ble.
Ground the equip ment against elec tro sta tic char ging.
7.3. Sto ra ge
Bet ween de li very and ma chi ne com mis sio ning the equip ment should be sto red in a dry, dust-free
and vi brat ion-free room.
The con trol sys tem may only be sto red at tem pe ra tu res from -25 to +55°C (-13 to +131 °F).
146-3MS
SKW-E
Tran sport, As sem bly and Sto ra ge 7-2