Engineering Data : Hoisting
19
B
D
C
80°MAX
80°MAX
A
Model
Lower Module Upper Module
A B
Weight
kg
C D
Weight
kg
90111 510 1250 240 920 1250 335
90112 1420 1250 380 1834 1250 455
90113 2340 1250 515 2746 1250 575
90114 3300 1250 655 3658 1250 695
90115 2690 1250 930 5482 1250 935
90154 1245 2400 1820 3550 2400 1265
90155 3075 2400 2417 5380 2400 1700
90173 2515 2980 1634 2680 2960 1220
90174 1295 2980 2176 3680 2960 1465
90175 2745 2980 2838 5360 2960 2130
90194 1245 3600 2227 3550 3600 1670
90195 3075 3600 2965 5380 3600 2615
1 Hoisting operations can be dangerous and suitable safety
precautions should be taken to protect personnel and the
equipment being hoisted.
2 All hoisting equipment should be certified and comply with
local and national safety regulations.
NOTE
3 Ensure that slings are of sufficient length so not to impose
bending loads onto the casing—use of spreader bars is
essential.
4 For overhead lifts or where additional safety is required, add
slings beneath the tower unit