Schneider Electric ACECFR20201SE Fan User Manual


 
21EcoBreeze System Installation
Electrical Connections
The electrical connections required are the following:
Power to Frame
Control (remote display interface)
Communication - Building Management System (BMS) - optional
Make all electrical connections in accordance with applicable industry guidelines as well as
national and local codes.
Make all low-voltage connections, including data and control connections, with properly
insulated wires. The low-voltage wires and connections must have at least 300V insulation.
N
OTE: Three-phase electrical service is required. Electrical service must conform to national
and local electrical codes.
DANGER
HAZARD OF ELECTRIC SHOCK
Use a voltmeter to ensure that power is turned off before making any electrical
connections.
Failure to follow these instructions will result in death or serious injury.