CHECK AND TEST OPERATION
E-31
/
CHECK AND TEST OPERATION
◆ Be sure to check the following again after completion of installation.
1. Check the piping connection area for any gas leakage.
2. Is the drain hose properly connected?
3. Is the insulation of the piping in good condition? 4. Is grounding properly made?
Outdoor
connection area
Indoor
connection area
Indoor and
outdoor connection
Drain hose
30cm(11 inch)
5
4
Insulation
Check