Roberts Gorden DAT90 Heating System User Manual


 
SECTION 6: FLUE INSTALLATION
11
5. Refit the air intake spigot to the flexible hose re-
using the hose clamp and to the upper panel
using the original screws.
6. Align the flues’ inner and outer spigots and
attach through the holes in the upper panel re-
using the original screws.
7. Refit the lower door.
Figure 5: Control Section & Upper Panel
Figure 6: Alternate
Upper Panel
Lower Door
Blanking Plate
Hose Clamp
360 mm Length
of 130 mm dia Flue
Flexible Hose
Inner and Outer
Flue Spigots
Air Intake Spigot
Control Section
Spigot "A"
90° Bend
90mm Flue
Inner Spigot
Hose Clamp
Flexible Hose
Upper Panel
Outer Spigots