Rinnai E75CN Boiler User Manual


 
Installation & Servicing Instructions Rinnai E-Series
43
Freeze protection
Freeze protection for new or existing systems must use glycol that is specially
formulated for this purpose. This includes inhibitors, which prevent the glycol from
attack the metallic components. This should be for multi-metallic components.
Make certain to check that the system uid is correct for the glycol concentration and
inhibitor level. The system should be tested at least once a year and as recommended
by the producer of the glycol solution.
Use only Rinnai approved inhibitors. See the Rinnai Boiler Applications Manual
for an approved list of inhibitors.
Use only inhibited propylene glycol solutions, which are specially formulated
for central heating systems. Ethylene glycol is toxic and can attack gaskets
and seals used in the boiler and system. Approved glycols ae listed in the
Rinnai Boiler Applications Manual.
Additives in the installation water are not permitted.
9.2 Filling the heating system
For lling or topping up the installation you use the lling loop according to the following
procedure:
1 Switch on the power supply;
2 The display will show FILL;
3 All functions off (heating , DHW and pump );
4 Push briey the 'STEP'-button: P XX (XX = water pressure in PSI);
5 Open the lling loop (Indication on display increases);
6 Fill up slowly to 22 to 25 PSI;
7 STOP appears on the display;
8 Close the lling loop;
9 De-aerate the complete installation, start at the lowest point;
10 Check the water pressure and if necessary top it up;
11 Close the lling loop;
12 Activate the functions in use (heating , DHW and/or pump );
13 If A XX appears on the display, wait for 17 minutes;
14 Check the water pressure and if necessary top it up to 22 to 25 PSI
15 Close the lling loop;
16 Press the ‘STEP’-button;
17 Be sure that the lling loop is closed.
18
After the automatic de-aeration program (A XX) is nished the boiler will return to
the Good state or Technical read out.
Check the water pressure regularly and top off the installation when necessary.
The working pressure of the installation should be between 22 and 25 PSI when the
system is cold.
NOTICE
i
NOTICE
i
!
WARNING