R
R
R
September 1, 2008
7014-082D
Page 19
CB 1200 Pellet Stove
D. Optional Brick Set Installation
1. Remove the bafe rst, follow instructions on page 33.
2. Slide bottom of left rear brick in rst; rotate top edge
toward rear of appliance and then rotate outer edge
toward rear of appliance, until brick slides into place.
Figure 19.1.
. Repeat with right rear brick.
4. Place left side brick along left side of rebox, making sure
chamfered (beveled) back edge of brick ts snugly next
to rear brick. Figure 19.2.
5. Repeat with right side panel.
6. Complete brick set, correctly installed. Figure 19.3.
1
2
1
2
4
Figure 19.1
Figure 19.2
Figure 19.3
1. After the brick set has been installed, 2 brick clips need
to be installed on the outer edge of each bafe to hold
the brick set in place.
2. Remove 2 bafes from the appliance. Slide the bafe up
and the bottom edge should fall down and then lift the
bafe out.
. Using pliers, bend the brick clip slightly past 90° in the
direction shown in Figure 19.4.
4. Position the brick clip as shown in Figure 19.4 and use
pliers to crimp around the outside edge of the bafe as
shown in Figure 19.5.
Note: Figure 19.5 shows the nished shape of the brick
clip, after being bent around the outside edge of
the bafe.
5. Slide the bafe back into place making sure that the brick
clip holds the side brick toward the wall of the rebox.
Push back on the sides so they will keep the rear bricks
in place. Repeat for opposite side.
Approximately
1 inch from corner
Top outside
corner of Baffle
Outside edge
of Baffle
Use pliers to crimp
Brick Clip around edge
Installed Clip
E. Brick Clip Installation
• Brick may have small wires protruding from
the back of brick.
WARNING
Risk of Injury.
Figure 19.4
Figure 19.5
1