PVI Industries 150 Water Heater User Manual


 
29
PV500-46U 06/12
14 INITIAL STARTUP
14.1 Initial Startup Requirements
Installation should be complete prior to performing initial startup; and the startup must be complete prior to placing
the water heater into service. Starting the water heater without proper piping, combustion air, venting or electrical
systems can be dangerous and may void the product warranty. The following startup instructions should be followed
precisely in order to achieve safe and efficient operation to assure trouble-free service life.
WARNING: Proper startup must be made by a qualified installer or service agency, who must read and
follow the supplied instructions and appliance markings. Failure to complete proper startup before use,
tampering with controls or not following all instructions and markings may damage this equipment, void
the warranty and may result in property damage, personal injury or death.
A Start-up Form is included with each product and must be completed by the qualified installer or service agency
conducting the startup and must be returned to the manufacture to register the warranty. Copies are available at
www.pvi.com.
WARNING: Turn off all power to the water heater when servicing or accessing the blower drive. The blower
drive still has power when appliance switch is off. Failure to turn off all power to the water heater can cause
personal injury, property damage or loss of life.
14.2 Tools and Instrumentation Required
Stack Temperature Gauge
Stack Draft Gauge
Electronic Combustion Analyzer
Manometer for checking gas pressure (2 minimum)
AC/DC Multi-meter (with 20,000 OHM/Volt rating)
Amp Meter
Normal Hand Tools
14.3 Resources
Product Installation & Maintenance Manuals
Start-up Report with instructions
Local, State, & Federal Codes
Toll Free 24-Hour Technical Support: 1-800-433-5654
14.4 On Site Considerations
Electrical Supply in accordance with Nameplate Rating
Uncontaminated Combustion Air
Adequate Fuel Supply
Treated Water Supply (Water heaters)
Consistent Draft
14.5 Startup Procedure
1 Carefully study the burner start-up information included in this manual.
2 Fill system tank with water. Some water appliances may be equipped with an optional air vent. If venting
through the safety valve when filling the appliance, insure gags or fixtures are removed from the safety valve
prior to start-up. Open the safety valve to allow air in the tank to escape.
3 Be sure all connections into the tank are tight, as leaks at tank fittings will damage the insulation.
4 CAUTION: Conduct the following gas train leakage test before start-up, at annual intervals and prior to
investigating the cause of any reported occurrences of delayed ignition.
a. Using an appropriate bubble detection solution, thoroughly coat all gas train pipe connections. If any
bubbles are detected, the leaking connection must be tightened, recoated, and rechecked to assure
stoppage of the leak.