10
Installing decorating logs
3.Place one end of log 3 onto the hole on grate,
with the other end placed on log 1 (where marked).
(See FIG 4).
Installing logs for SFE23RE:
4.Insert the pin on log 6 to the recessed hole on
log 4, and place log 6 as figure shows. (See FIG 9).
Installing logs for SFE33RE:
FIG 1 - Logs for SFE23RE
1.Insert the two pins on log 1 to the two recessed
holes at the middle of grate. (See FIG 2).
2.Insert the pin on one end of log 2 to the recessed
hole on log 1, with the other end of log 2 placed
on the ember bed (where marked). (See FIG 3).
FIG 5 - Logs for SFE33RE
1.Place log 1, log 2 and log 3 into the correspond-
ing holes on grate. (See FIG 6).
2.Insert the pin on one end of log 4 to the recessed
hole on log 1, with the other end of log 4 placed
where marked. (See FIG 7).
3.Insert the pin on one end of log 5 to the recessed
hole on log 2, with the other end of log 5 placed
where marked. (See FIG 8).
FIG 2
FIG 3
FIG 4
FIG 9
FIG 8
FIG 7
FIG 6
9
1
2
123
1
2
3
1
123
41253
4123
641253
1
23
456