Panasonic ESB92D Plumbing Product User Manual


 
Design and specifi cations are each subject to change without notice. Ask factory for the current technical specifi cations before purchase and/or use.
Should a safety concern arise regarding this product, please be sure to contact us immediately.
Power Switches
Item Information (Requirements)
Common
C-1 Inquiry purpose New use, Modifi cation, Others ( )
C-2 Modifi cation
Previous supplier
Conventional part No.
Purpose
C-3 Application
Equipment
Environment Indoor/Outdoor use, Stationary/Portable set, High humidity, SO
2
, NaCl
Temperature ( °C) to ( °C)
Regulations
S-1
Safety
Standards
(Ratings)
UL
CSA
TV-5
SEMKO DEMKO
VDE NEMKO
BEAB FIMKO
SEV (SETI)
4 A/128 A 250 Vac
(Based on IEC standards)
Others
Shapes/Dimensions
M-1 Operation
Operation type Push type, Others ( )
Operating force When specially requested ( N)
M-2 Circuit Diagrams SPST, DPST
M-3
Lever length (Push type) 18.0 mm
Travel (Push type)1.5 mm, 2.5 mm
M-4 Mounting
Mounting holes 2-M3
҂
0.5 Tap, 2-
f
3.2 hole W/O Mounting Plate, Others ( )
Supporting legs Necessary (PWB mount type, Solder lug type), Unnecessary
Mounting height PWB to center of rod
M-5 Terminals
Shape PWB, Solder lug, Others ( )
Connection Manual soldering, Wave soldering
M-6 Lever top dimensions Width ( mm)
҂
Height ( mm)
҂
Length ( mm)
Others
L-1 Special requirements for endurance
L-2 Special requirements for safety
L-3 Other questionnaires
When specifying Power Switches, please take advantage of our standard products for better price and delivery.
Please inquire about the following items before ordering.
Power switches described here are not under jurisdiction of the Electrical Appliance and Material Safety Law (Japan), but comply with its
tech ni cal requirements.
Notes:
1. When you specify custom types (custom-made), new tooling and jigs, and/or equipment may be required. It will be necessary to confi rm your
estimates of quantity and development schedule as accurately as possible.
2. Please inform us if you designate your own part number.
Checklist Before lnquiry
Nov. 2005