40
11-1. MUZ-GE09NA MUZ-GE12NA MUZ-GE15NA
MUY-GE09NA MUY-GE12NA MUY-GE15NA
NOTE: Turn OFF power supply before disassembling.
OPERATING PROCEDURE PHOTOS
1. Removing the cabinet
(1) Remove the screw fixing the service panel.
(2) Pull down the service panel and remove it.
(3) Remove the screws fixing the conduit cover.
(4) Remove the conduit cover.
(5) Disconnect the power supply wire and indoor/outdoor
connecting wire.
(6) Remove the screws fixing the top panel.
(7) Remove the top panel.
(8) Remove the screws fixing the cabinet.
(9) Remove the cabinet.
(10)
Remove the screws fixing the back panel.
(11)
Remove the back panel.
Photo 2
Photo 1
Screws of
the cabinet
Back
panel
Service
panel
Screws of
the top panel
Screw of the
cabinet
Screws
of the top
panel
Hooks
Screw of
the service
panel
Screw of the
conduit cover
Conduit plate
Conduit cover
(1) Slide the sleeve and check if there is a locking lever or not.
(2) The terminal with this connector has the
locking mechanism.
Slide the sleeve.
Pull the terminal while
pushing the locking
lever.
Hold the sleeve, and
pull out the terminal
slowly.
Connector
Sleeve
Locking lever
<"Terminal with locking mechanism" Detaching points>
The terminal which has the locking mechanism can be detached as shown below.
There are two types (refer to (1) and (2)) of the terminal with locking mechanism.
The terminal without locking mechanism can be detached by pulling it out.
Check the shape of the terminal before detaching.
11
DISASSEMBLY INSTRUCTIONS