Master Lock RADIANT PANEL SYSTEM Heating System User Manual


 
5A. INSTALLATION INSTRUCTIONS
Continue to lay the master panels. When
cutting the master panels, mark the plate and
saw it with EPS side up. You can use any
saw with a fine-toothed metal blade. After
cutting the panel, remove any burrs. When
cutting the last master panel in the first row,
use the rest of the panel to start the next
row. This will provide staggered joints for the
field panels.
After completion of the panel installation in an area, use a vacuum to clean up thoroughly
before installing the tubing. Dirt and debris in the tracks can create noise when the system is
put into operation.
5A 3