Section O-
Figures 1-5
Flame Deflector Plate
*All Top surfaces to be gasketed
With 1/8” gasket before replacing baffle
system
Bypass
Control
Rod
3/8 X 3/4 S.S.
(16 thread)
Bypass Plate
1/2” thickness
15 1/2”
Figure 1
“C”- Catalytic hold
down clamp
22
1 1/2”
3 5/8”
1 1/2”
14”
5/8”
“B”
“A”
1” Clearance
Between Catalytic
and flame
deflector
“D” Catalytic Units (2)
2 1/2” Tall
7 1/2” Wide
3” Deep
16 Cells per sq. Inch
Re-gasket each catalytic unit once with 1/8” X 2” gasket
Wrap each pre-wrapped unit with 1/8” X 2” gasket
Typical Home Installation
All KUMA stoves must be installed and operated in
accordance with all local, state, and Federal laws,
codes, and ordinances.
NOTE: All reduced clearance installations must use
U.L. approved double wall stove pipe.
C
D
B A
Figure 2
Standard Reduced
Clearance Clearance
Pipe Connector
Floor Protector
8”
Min.
8” Min.
8”
Min.
18” Min.
Stove
E
E
F
G
Stove
Stove
Figure 3 Figure 4
Figure 5
A =14
B =18
C =22
D =36
E =24
F =22
G=36
A =7
B =11
C =15
D = 27
E =19
F =15
G =27
U.S. (in inches)
Canada (en mm)
A =406
B =508
C =635
D =914
E =660
F =432
G=914
A =229
B =330
C =406
D =686
E =533
F =305
G=686
11