Heatmaster 150 JUMBO Fan User Manual


 
FILLING THE HOT WATER AND HEATING CIRCUITS
IMPORTANT
Hot water tank must be pressurised before the heating
circuit is filled.
1. Close the primary circuit filling valves (A)
2. Open the stop valve (B) and the drawoff tap (C).
When water flows out of the tap, the hot water tank is full and
the drawoff tap (C) should be closed.
3. Fill the primary (heating) circuit by opening the valves (A) and
pressurising to 1 bar.
4. Open the automatic air vent located on top of the boiler.
IMPORTANT - the screw cap must be left loose to allow future
automatic venting to take place.
5. After venting the air from the system, bring the pressure up to
the static head plus 0.5 bar: 1.5 bar = 10m and 2 bar = 15 m.
6. Check that the electrical connection and boiler room ventilation
conform to the relevant standards.
7. Set the thermostat between 60 and 90 °C.
8. Switch the on/off switch to the ON position.
9. For gas burner, check the gas supply pressure on starting up.
10. For the oil burner, check the oil supply (and return). Proceed
with the necessary venting, measurements and settings.
11. Set the heating control to heat demand. When the burner
operates, check the flue gas discharge pipes for leaks.
12. After 5 minutes of operation, vent the primary circuit again
maintaining the water pressure at 1 bar.
13. Then restart the unit and check the combustion.
14
COMMISSIONING
HeatMaster 60 N
HeatMaster 70 N and 100 N
HeatMaster 150 Jumbo
B
C
A
I
O
B
C
I
O
A
B
C
bar
umbo
1
8
1
7
1
6
1
5
1
4
1
3
1
2
1
1
1
0
9
8
7
6
5
4
3
2
1
2
4
2
3
2
2
2
1
2
0
1
9
GRASSLIN
GRASSLIN
I
O
Kerkplein 39
1601 Sint-Pieters-Leeuw(Ruisbroek) Belgium
Num.
Code
Typ.
Anno
Max. Temp.
Chauffage-CV-Heizung
Eau sanitair. water-Brauchwasser
Débit-Debiet-Abflussmenge
Agréation-Keuring-Prüfnummer
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
A