5 Hearth & Home Technologies Inc. • SFE-ST • 4050-510 Rev A • 05/08
H. Finishing and Trim
Combustible or non-combustible materials may be used to
fi nish up to the appliance opening.
The nailing fl anges and drywall ledge permit installation of
drywall fl ush to the front metal frame.
Trim material can cover the metal frame creating a true
clean face installation.
Drywall Flush to Metal Frame Trim Materials Covering Metal Frame
HOT_LINE
GROUND
NEUTRAL
M2
MOTOR
M
LD1
5 WATT LED
POWER SUPPLY
FIXED EMBER BED
AND BACK LOG LEDS
REMOTE RECEIVER
EMBER
FLAME
SFE-ST WIRING DIAGRAM
M1
MOTOR
M
LD2
5 WATT LED
LED EMBER MOTION CIRCUIT
FLAME EFFECT PROJECTOR 1
FLAME EFFECT PROJECTOR 2
LED
LED LED
R1
LED
LED LED
R2
WALL SWITCH
LED LED LED
R3
LED
LED LED
R4
D1
1N4001
OPTIONAL WSK-21
INPUT 120 VOLT 60 HZ
25 WATTS MAX
OUTPUT
12 VDC
1.5 AMP
SFE-ST Wiring Diagram