Haier AB242XCAAA Air Conditioner User Manual


 
3. PREPARATION FOR THE INSTALLATION
(1) Position of ceiling opening between unit and suspending bolt.
3
25
(2) Cut an opening in ceiling for installation if necessary. (when ceiling already exists.)
(3) Install a suspending bolt.
(Use a M10 bolt)
To support the unit weight, anchor bolt shall be used in the case of already exists ceiling. For new
ceiling, use built-in type bolt or parts prepared in the field.
Before going on installing adjust space between ceiling.
<Installation example>
Note: All the above mentioned parts shall be prepared in field.
Ceiling
50~100
Roof
Anchor bolt
Long nut
Suspending bolt
Refer to paper pattern for dimension of ceiling hole.
Connect all pipings (refrigerant, water drainage), wirings (inter unit cable) to indoor unit, before installation.
Cut a hole in ceiling, may be a frame should be used to ensure a smooth surface and to prevent vibration.
Contact your real estate dealer
(160)
Suspending bracket
Ceiling
A
950(Ornament panel)
890(Ceiling opening)
840(Indoor unit)
780
(Distance between suspending bolts)
(Distance between suspending bolts)
A
950(Ornament panel)
890(Ceiling opening)
840(Indoor unit)
Suspending bolts
Refrigerant pipe
A
Installation Procedure