GE AGMO5 Air Conditioner User Manual


 
Consumer SupportTroubleshooting TipsOperating InstructionsSafety Instructions Installation Instructions
11
Read completely, then follow step-by-step.
Window Requirements
These instructions are for a standard double-
hung window. You will need to modify them for
other types of windows.
The air conditioner can be installed without
the sliding panels if needed to fit in a narrow
window. See the window opening dimensions
to the right.
All supporting parts must be secured to firm
wood, masonry or metal.
The electrical outlet must be within reach of the
power cord. Do not use an extension cord.
13 min.
22to 36
(with sliding panels)
18
3
4min.
(without sliding panels)
Storm Window Requirements
A storm window frame will not allow the air
conditioner to tilt towards the outside and will
keep it from draining properly. To adjust for this,
attach a piece of wood to the stool.
WOOD PIECES—
WIDTH: 2
LENGTH: Long enough to fit inside the window
frame.
THICKNESS: To determine the thickness, place a
piece of wood on the stool to make it 1/2higher
than the top of the storm window frame.
Attach securely with nails or screws provided by
the installer.
1/2 higher
than frame
Storm window
frame
Wood
Stool
1
2
Prepare the Window and the Case
Cut the window sash seal to the proper length.
Peel off the backing and attach the seal to the
underside of the window sash.
Insert the sliding panels into the guides of the
air conditioner and attach them to the case
with 8 Type B screws, 4 on each side.
Use Type B screws.
BA
3
Sash
Seal