Friedrich SQ08 Air Conditioner User Manual


 
28
Thru-the-wall Installation
STEP 1. $IWHUUHPRYLQJWKHXQLWIURPVKLSSLQJFDUERQVOLGHFKDVVLVRXW
of cabinet (See Figure 16, page 25).
STEP 2. 5HPRYH the shell channel from the top of the cabinet (See
Figure 15, page 24).
NOTE: 1RWDSSOLFDEOHWRKHDWSXPSPRGHOVVROGZLWKRXWTXLFNPRXQWLQJ
cabinet.
WARNING
Falling Object Hazard
Not following Installation Instructions
for mounting your air conditioner can
result in property damage, injury, or
death.
STEP 3. /$<287&XWDQGIUDPHLQDQRSHQLQJLQWKHGHVLUHGZDOODUHD
using the illustration as a guide (See Figure 23).
STEP 4. Place the cabinet in the framed opening.
NOTE: Measure and shim void spaces between the side of cabinet and
wood framing before securing to wall.
STEP 5. 3RVLWLRQWKHIURQWHGJHWRH[WHQGLQWRWKHURRPPLQLPXP
at top of cabinet and 1" minimum at bottom (See Figure 24).
STEP 6. 6HFXUHHDFKVLGHRIWKHFDELQHWZLWK1R[KH[KHDG
VFUHZVLWHPSDJHRUQDLOVWKURXJKWKHKROHVLQWKH
sides.
NOTE: $OWHUQDWHIDVWHQHUVZKLFKPD\EHXVHGIRUVHFXULQJWKHXQLW
cabinet to a wall, including masonry walls, are not furnished
(available at local hardware stores).
FRR091
FINISHED OPENING SIZE
2 x 8 FRAME
20
20
14-1/4
14-1/4
CONCRETE BLOCK CONSTRUCTION FRAME CONSTRUCTION
EXPANSION ANCHOR BOLT
MOLLY OR TOGGLE BOLT
Figure 23