Drolet HT-1600 Stove User Manual


 
7
BRICK AND INSULATION INSTALLATION (HT-2000)
The stove is normally supplied with secondary air tubes in position. To install the baffle bricks
and white ceramic insulation, it’s necessary to remove the two front secondary air tubes. First
place only one baffle brick and one white ceramic insulation. Use the same method to put the
other baffle brick and insulation. Put back in place the secondary air tubes.
Install the yellow insulation and the 6" x 8" or 6" x 6" bricks. Install the side and bottom bricks.
Figure 3: HT-2000 Refractory Bricks Assembly