ENGLISH8
Peterbilt 379 Installation Guidelines
ROUTING CABLES
The box contains several types of cables:
• Wires enclosed in split loom
• Flexible power cables
• Phone-type cables
The wires in split loom go to the CHEB unit. The
flexible power cables go to the power distribution
panel. The phone cable mounted on the CHEB unit
plugs into the hole marked TSEP. The phone cable
from the Control/Display plugs into the hole marked
Display.
All cables should be neatly routed and clipped to
prevent chafing.
IMPORTANT!
Refer to the Dometic installation manual for
details on routing and connecting cables
from the Control/Display panel to the PLB
and CHEB.