Desa P)R Electric Heater User Manual


 
www.desatech.com
119426-01A14
CONNECTING TO GAS SUPPLY
WARNING: This appliance
requires a 1/2" NPT (National
Pipe Thread) inlet connection to
the pressure regulator.
WARNING: A qualied ser-
vice person must connect heater
to gas supply. Follow all local
codes.
CAUTION: Never connect
propane/LP replace directly
to the propane/LP supply. This
heater requires an external regu-
lator (not supplied). Install the
external regulator between the
heater and propane/LP supply.
WARNING: Never connect
natural gas replace to private
(non-utility) gas wells. This
gas is commonly known as
wellhead gas.
Installation Items Needed
Before installing heater, make sure you have the
items listed below.
external regulator (supplied by installer)
piping (check local codes)
sealant (resistant to propane/LP gas)
equipment shutoff valve *
test gauge connection *
sediment trap
tee joint
pipe wrench
approved exible gas line with gas connector
(if allowed by local codes) (not provided)
* A CSA design-certied equipment shutoff valve
with 1/8" NPT tap is an acceptable alternative to
test gauge connection. Purchase the optional CSA
design-certied equipment shutoff valve from your
dealer. See Accessories, page 42.
For propane/LP units, the installer must supply
an external regulator. The external regulator will
reduce incoming gas pressure. You must reduce
incoming gas pressure to between 11" and 14" of
water. If you do not reduce incoming gas pres-
sure, heater regulator damage could occur. Install
external regulator with the vent pointing down
as shown in Figure 14. Pointing the vent down
protects it from freezing rain or sleet.
CAUTION: Use only new,
black iron or steel pipe. In-
ternally-tinned copper tubing
may be used in certain areas.
Check your local codes. Use
pipe of 1/2" diameter or greater
to allow proper gas volume to
heater. If pipe is too small, undue
loss of volume will occur.
Propane/LP
Supply Tank
External
Regulator
Figure 14 - External Regulator With Vent
Pointing Down
Vent
Pointing
Down
INSTALLATION
Continued