Desa LCR18NT Gas Heater User Manual


 
www.desatech.com
11121255-01A
3. Align holes in base foot with mounting holes
on bottom of cabinet (see Figure 13).
4. Secure base foot to heater using sheet
metal screws.
5. Repeat for other side.
INSTALLATION
Continued
Figure 14 - External Regulator With Vent
Pointing Down
External
Regulator
Propane/LP
Supply Tank
Vent
Pointing
Down
IMPORTANT: For natural gas, check gas line
pressure before connecting heater to gas line.
Gas line pressure must be no greater than
10.5" of water. If gas line pressure is higher,
heater regulator damage could occur.
CAUTION: For propane/LP
gas, never connect heater di-
rectly to the propane/LP supply.
This heater requires an external
regulator (not supplied). Install
the external regulator between the
heater and propane/LP supply.
For propane/LP gas, the installer must supply
an external regulator. The external regulator
will reduce incoming gas pressure. You must
reduce incoming gas pressure to between 11"
and 14" of water. If you do not reduce incom-
ing gas pressure, heater regulator damage
could occur. Install the external regulator with
the vent pointing down as shown in Figure
14. Pointing the vent down protects it from
freezing rain or sleet.
CAUTION: Use only new,
black iron or steel pipe. Inter-
nally-tinned copper tubing may
be used in certain areas. Check
your local codes. Use pipe of
large enough diameter to allow
proper gas volume to heater. If
pipe is too small, undue loss of
volume will occur.
Typical Inlet Pipe Diameters
16-18,000 Btu/hr models - 3/8" or greater
26-30,000 Btu/hr models - 1/2" or greater
Installation must include equipment shutoff
valve, union and plugged 1/8" NPT tap. Locate
NPT tap within reach for test gauge hook up.
NPT tap must be upstream from heater (see
Figure 15, page 12).
Figure 13 - Installing Base Feet (actual
heater may vary from illustration)
Sheet
Metal
Screw
Wood
Screw
Base Foot
Mounting Base Feet to Floor
1. Remove front panel (see Removing Front
Panel of Heater, page 9).
2. Position heater with base feet in desired
location. Mark holes for drilling. Remove
heater with base.
3. For carpeted oors, make a small cut with
a sharp knife at marked locations prior to
drilling. If mounting base to a wood oor,
drill 1/8" diameter hole, 3/4" deep. (Do not
use anchors in wood oors).
If mounting base to a concrete oor, drill
with 1/4" diameter concrete drill bit, 1
3
/
8
" into
oor. Insert anchors completely into holes.
4. Reposition heater with base feet over
holes. Secure base to oor with wood
screws. See Figure 13.
CONNECTING TO GAS SUPPLY
WARNING: This appliance
requires a 3/8" NPT (National
Pipe Thread) inlet connection to
the pressure regulator.
WARNING: A qualied service
person must connect heater to gas
supply. Follow all local codes.
WARNING: For natural gas, never
connect heater to private (non-util-
ity) gas wells. This gas is commonly
known as wellhead gas.