8
104461
VENT-FREE NATURAL GAS STOVE HEATER
DESA INTERNATIONAL
INSTALLATION
Continued
Figure 6 - Laying Down Stove On Side (Stove Style May Vary Depending on Model)
Front of
Stove Unit
Pallet Wood
Bolted to
Stove Body
Bottom
Top of Stove Unit
Front of
Stove Unit
Top of
Stove
Unit
Drop Cloth/
Blanket
5. Remove all contents from inside stove
cavity. Contents include:
(1) - Stove bottom
(4) - Legs (Amity and Townsend
models include leg leveler bolts)
(1) - Bottom door
(1) - Top grate
(1) - Hardware kit bag with fasteners
6. Carefully lay stove body on back to
attach bottom components to stove
body (see Figure 6). Rest stove on drop
cloth or blanket to avoid scratching
stove edges.
7. Remove remaining pallet wood at-
tached to bottom of stove body (see
Figure 7). Use an adjustable wrench to
remove bolts.
Figure 7 - Removing Pallet Wood From The Bottom of The Stove
Pallet
Wood
Bolt
Pallet
Wood
Bottom Of
Stove Unit
Front
STOVE CAVITY ASSEMBLY
1. Lift off corrugated box enclosing stove
body crating.
2. Remove all screws fastening the wood
frame enclosure. Spread wood frame
open and lift away from plastic-
bagged stove body. The bottom pieces
of pallet wood will remain bolted to
the stove body.
3. Remove plastic bag from stove body.
4. Remove back panel from stove (see
Figure 5). Use an adjustable wrench or
a 10 mm socket. Remove six (6) bolts
and washers. Keep bolts and washers
to reattach back panel later.
Figure 5 - Removing Back Panel
Bolt
Product
Identification Label
Back Stove Panel