DAVIS 6322 Home Security System User Manual


 
13
Preparing the ISS for Installation
Once all the sensors have been connected and communication between the ISS and the
console has been successfully established, continue to prepare the ISS unit for
installation. The steps for preparing the ISS for installation are as follows.
•Close the SIM Box
Prepare the Solar Panel
Prepare the Rain Collector
Site the ISS and Anemometer
Close the SIM Box
To close the SIM box and continue assembling the ISS:
1. If the solar panel wire was disconnected during ISS assembly, reconnect the wire on
the SIM box cover to the solar panel tab on the SIM board.
Note: See “SIM Board Display and Contents” on page 30 for information on locating the solar panel tab.
2. Look on the side of the SIM box. Match up the box cover alignment indicator with the
alignment indicator on the SIM box and place the cover against the box.
3. Slide the cover down until it snaps securely in place.
Prepare the Rain Collector
The tipping bucket is secured at the factory to protect it from
damage during shipping. To use the ISS properly, the bucket must be
released. To release the bucket:
1. Remove the rain collector cone from the ISS base by rotating the
cone counter-clockwise. When the cone’s latches line up with
openings in the base, lift the cone off the ISS base.
When new, the cone fits tightly in the base and may require extra
pressure to remove. Steady the ISS base between your knees
when removing the cone.
2. Carefully cut and remove the
plastic tie that holds the tipping
bucket in place during shipping
(usually yellow in color).
3. On your console screen, look for
the DAILY RAIN display.
If the console is cabled to the ISS,
reconnect the cable and see if the
console is receiving rain readings.
Twist to Open
Tipping Bucket
Cut the
plastic tie
07395.249 Manual ISS Installation_RevE_Final_Print.pdf 15 4/7/2008 1:44:49 PM