Dansons Group FGB Stove User Manual


 
19
Walkout Basement or Main Floor
Basement or Main Floor
1
Pipe Adapter
Clean Out Tee & Cap
Tee Support Bracket
Horizontal Rain Cap
2
3
4
5
6
7
8
90 Deg Elbow
36” Pipe Length
12” Pipe Length
12” Adjustable Pipe Length
Wall Thimble9
1 Pipe Adapter
Clean Out Tee & Cap
Tee Support Bracket
Horizontal Rain Cap
2
3
4
5
6
7
8
90 Deg Elbow
36” Pipe Length
12” Pipe Length
12” Adjustable Pipe Length
Wall Thimble
9
10
24” Pipe Length x 2
10
1
2
3
4
5
6
7
8
Ground Level
Floor / Ceiling
12”
12”
9
9
Tube of RTV Silicone
Roll of Foil Tape
3/8” Stainless Self-Tapping
Screws x 27
2” Wood Screws x 10
Options
Tube of RTV Silicone
Roll of Foil Tape
3/8” Stainless Self-Tapping
Screws x 21
2” Wood Screws x 10
1
2
3
4
5
6
7
8
9
These styles of installation are highly recommended, due to possible backpressure in the exhaust caused by
airflow around the outside of the structure, snow build-up, or power failure, etc.. These designs will improve
venting performance and provide natural draft to help evacuate smoke from the appliance in case of power
failure.
Follow the same basic steps in locating your appliance, attaching the exhaust system and outside air intake to
your stove as the previous examples.
1
2
3
4
5
6
7
8
Main Floor - Vertical
1 Pipe Adapter
Clean Out Tee & Cap
3 x 60” (15’) Pipe Length
Tee Support Bracket
Ceiling Support / Firestop Spacer
Roof Flashing
Storm Collar
Vertical Rain Cap
2
3
4
5
6
7
8
Tube of RTV Silicone
Roll of Foil Tape
3/8” Stainless Self-Tapping
Screws x 27
2” Wood Screws x 10
8”
16”
Optional
Metal Plate
1
2
3
4
5
6
7
8
9
24”
Hearth Stove - Existing Reline
1 Pipe Adapter
Single Wall Stainless Steel
Clean Out Tee & Cap
Storm Collar
Vertical Rain Cap
2
3
4
5
6
7
8
Hi Heat Insulation
“All Fuel” Stainless Steel
Flex Liner
Roof Flashing
Liner Support
Dripless Connection
9
Tube of RTV Silicone
Roll of Foil Tape
3/8” Stainless Self-Tapping
Screws x 27
6”
PL Vent Length10
10
Outside Air may be obtained from a suitable duct passing through the
ash clean-out opening.
Ensure the chimney top is properly sealed to prevent intrusion of
weather and down drafts with suitable flashings, collars, and sealants.
F
F
REESTANDING
REESTANDING
I
I
NSTALLATION
NSTALLATION
. . . C
. . . C
ON
ON
T
T
Glow Boy Pellet & Biomass www.glowboystoves.com 19