Celestron VMH30SB-1 Heat Pump User Manual


 
8 Room Air Conditioner
Installation
Installation Map
Installation parts you should purchase.
NOTE: refrigerant line wall thickness must be at least 0.8 mm(0.031 inch)
Air Discharge
Forced Operation Button
Operation Indication Lamps/
Signal Receptor
Vinyl tape (Wide)
Apply after carrying out a
drainage test.
To carry out the drainage
test, remove the air filters
and pour water into the heat
exchanger.
Saddle
Gas side piping (Optional Parts)
Liquid side piping (Optional Parts)
Additional drain pipe
Vinyl tape (Narrow)
Drain Hose
Base Plate
Air Outlet Vents
Air Inlet Vents
Connecting cable
(Optional Parts)
Installation plate
Sleeve
Bushing-Sleeve
Putty(Gum Type Sealer)
Bend the pipe as closely
on the wall as possible,
but be careful that it
doesn't break or kink.
NOTICE