Celestron VMH30SB-1 Heat Pump User Manual


 
Installation Plate
Type "A" screw
Chassis
Hook
Installation plate
Left rear piping Right rear piping
C
D
B
A
Cutting Phase
Installation Manual 11
ENGLISH
Installation
The wall you select should be strong and solid
enough to prevent vibration
1. Mount the installation plate on the wall with
type "A" screws. If mounting the unit on a
concrete wall, use anchor bolts.
• Mount the installation plate horizontally by
aligning the centerline using a level.
2. Measure the wall and mark the centerline. It
is also important to use caution concerning
the location of the installation plate-routing
of the wiring to power outlets is through the
walls typically. Drilling the hole through the
wall for piping connections must be done
safely.
3. Install after removing one of the indicated
cutting phase according to the installation
location of the indoor unit's piping.
Fixing Installation Plate
• Drill the piping hole with a ø70mm(2.76in)
hole core drill. Drill the piping hole at either
the right or the left with the hole slightly
slanted to the outdoor side.
Drill a Hole in the Wall
5-7mm
(3/16"~5/16")
Indoor
WALL
Outdoor
ABCD
SD(30k) 120(4
3
/4") 110(4
1
/3") 43(1
3
/4") 43(1
3
/4")
CHASSIS
(Grade)
Distance mm(in)