Carrier Z8075-105 Heating System User Manual


 
23
Condensate Drain Connections — There are a to-
tal of five drain connections required on each unit: one primary
drain (on right-hand side of the unit) and four secondary drains
(two on each side of unit).
PRIMARY DRAIN — The primary drain is a 2-in. NPT pipe
connection located on the right-hand side of the unit looking at
the unit from the return air end. See Fig. 15-24.
With field-supplied fittings and pipe sections, plumb the pri-
mary condensate drain to the 2-in. FPT connector on the base
rail. Use a trap height of at least 4-in. for size 030-070 units
and 7-in. for size 075-105 units. See Fig. 24 and 25. Install with
a height dimension of at least 2-in. from the top of the exit pipe
from the trap section to the bottom of the connector. Apply a
bead of RTV or similar sealant around the pipe joint at the con-
nector in the base rail.
SECONDARY DRAINS (Units Installed on
Curb) — There are two secondary drain connections on each
side of the unit. See Fig. 26. There are secondary drains on
each side of the unit in the filter section and one on each side of
the unit in the supply fan section. There are labels marking
each location on the unit base rail. See Fig. 15-23.
Locate the four 1
1
/
4
-in. drain coupling assemblies and
mounting screws (shipped in a bag taped to the basepan in the
supply fan section, located behind the access panel marked
FAN SECTION). The drain couplings are a 10-gage plate with
a 1
1
/
4
in. half coupling welded to the plate.
At each secondary drain hole location, there is a 1
3
/
8
-in.
hole pre-drilled in the bottom of the base rail, surrounded by
four 0.20-in. engagement holes. Install a drain coupling assem-
bly using screws provided at each secondary drain hole loca-
tion. See Fig. 27. Do not attach any drain coupling assemblies
in the condenser section base rail.
Using field-supplied fittings and pipe sections, assemble U-
traps at each secondary drain fitting. See Fig. 28. Provide a
minimum size of ½-in. pipe for secondary drains. Use a trap at
least 4-in. deep for size 030-070 units and 7-in. deep for size
075-105 units. Apply a bead of RTV or similar sealant around
the drain assemblies.
Consult local plumbing codes for direction on joining multi-
ple drain lines. Total size of any combined line does not need
to exceed nominal 2-in. size of primary drain connection.
Fill the U-traps at the secondary drain locations prior to unit
start-up. Also check the U-traps before each cooling season to
ensure the traps are filled and functioning properly.
SECONDARY DRAINS (Units Installed on Steel Beam or
Slab) — There are two secondary drain connections required
on each side of the unit. See Fig. 26. There are secondary
drains on each side of the unit in the filter section and one on
each side of the unit in the supply fan section. There are labels
marking each location on the unit base rail. See Fig. 15-23. Pri-
or to final positioning of the unit, apply a bead of RTV or simi-
lar sealant around each secondary drain hole in the bottom of
the unit base rail. Then position the unit into final location.
Locate the four 1
1
/
4
-in. drain coupling assemblies and
mounting screws (shipped in a bag taped to the basepan in the
supply fan section, located behind the access panel marked
FAN SECTION). The drain couplings are a 10-gage plate with
a 1
1
/
4
in. half coupling welded to the plate.
After final positioning of the unit, perform the following
procedure:
1. At each of the four secondary drain locations (marked
with labels on the unit base rail), position the drain cou-
pling assembly in the side of the base rail. Mark the
screw holes and the drain hole locations on the base rail.
2. Drill holes for drain outlet (use 1
3
/
8
-in. hole saw) and for
the mounting screws (use
3
/
16
-in. drill bit).
3. Install a drain coupling assembly using screws provided
at each secondary drain hole location.
4. Using field-supplied fittings and pipe sections, assemble
U-traps at each secondary drain fitting. See Fig. 28. Pro-
vide minimum size of ½-in. pipe for secondary drains.
Use a trap at least 4-in. deep for size 030-070 units and
7-in. deep for size 075-105 units.
5. Apply a bead of RTV or similar sealant around the drain
assemblies.
Consult local plumbing codes for direction on joining multi-
ple drain lines. Total size of any combined line does not need
to exceed nominal 2-in. size of primary drain connection.
Fill the U-traps at the secondary drain locations prior to unit
start-up. Also check the U-traps before each cooling season to
ensure the traps are filled and functioning properly.