Carrier 2020 Air Cleaner User Manual


 
6
TO FAN COIL FIELD POWER CONNECTION
FUSED POWER CONNECTOR LEADS
FROM INSTALLATION COMPONENTS
(IN BAG ATTACHED TO POWER CORD)
AIR PURIFIER
POWER CORD
TO FAN COIL FIELD POWER CONNECTION
TO L2 FIELD POWER SUPPLY
TO L1 FIELD POWER SUPPLY
5 AMP IN-LINE FUSES
GROUND:
ATTACH TO FAN COIL
GROUND (CHASSIS)
CABLE CONNECTOR
TO SECURE POWER CORD
TO FAN COIL CABINET
A06515
Fig. 10 --- Fan Coil Chassis Ground
A
ir Flow Sensor
1) Slide flow sensor tabs into support bracket 2) Rotate flow sensor and clip into bracket
A06412
Fig. 11 --- Flow Sensor Install
GAPAB