New Buck Corporation 1127B Gas Heater User Manual


 
WARNING: ELECTRICAL GROUNDING INSTRUCTION: THIS APPLIANCE
IS EQUIPPED WITH A THREE-PRONG (GROUNDING) PLUG FOR YOUR
PROTECTION AGAINST SHOCK HAZARD AND SHOULD BE PLUGGED
DIRECTLY INTO A PROPERLY GROUNDED THREE-PRONG RECEPTACLE.
NOTE: #PE A24001 Blower Motor
Rating: 120 volts/60MZ/0.54 Amps. 1 P.H.
Blower Motor is standard on all Model 1127B. See page 38 for blower motor location.
NOTE: For convenience, allow licensed electrician to properly install a grounded 3-plug
receptacle near the unit.
SERVICING
Repair and replacement work should only be performed by a qualified service technician.
Always shut off the gas supply and make sure heater is cool before beginning any service
operation. Check for gas leaks after servicing.
REPAIR PARTS
A parts list with exploded view follows. Always include correct name, part number, and model
number of the heater when ordering service parts. Please contact your local dealer or distributor
when ordering. If one is not available, you may contact:
New Buck Corporation
8000 Highway 226 South
Spruce Pine, NC 28777
828-765-6144
29