New Buck Corporation 1110 Gas Heater User Manual


 
INSTALLATION
NOTE: This heater may be installed three different ways:
1. Wall Mounted
2. Freestanding heater (with optional pedestal)
3. Freestanding (with optional wooden mantel)
NOTE: Do not set unit flat on any surface without Pedestal or Wooden Mantel.
WALL MOUNT INSTALLATION:
1. After determining the location for the heater, unfold the template provided and place the bottom
of the template a minimum of 7" from bottom of unit to floor.
NOTE: Be sure to level the template before punching the holes.
2. With the template in place and the four black dots centered on studs, punch the four centers
marked in the black dots with a sharp pointed object. Insert the four wood screws provided with
the unit into the four punched holes.
NOTE: Leave 5/8" of the screw projecting from the finished wall.
For sheet rock walls, use wing nuts or anchor wings. Remove the wing nut from the bolt. Place a nut
and washer with the same thread and size on the bolt. Push the wing nut through the wall surface
allowing the wings to spread. Tighten the nut that you placed on the bolt, leaving the required 5/8"
between the back of the bolt head and the finished wall.
FINISHED WALL
5/8" or 15.875 mm
5/8" or 15.875 mm
Stud Wall
Sheet Rock
Wing Nut
Washer
Nut
Toggle Bolt
Figure 4
Figure 3
9