—7—
ACCESSORIES
CONCENTRIC VENT
DIMENSIONS (In.)
*
Dimension A will change accordingly as dimension D is lengthened or shortened.
†Dimension D may be lengthened to 60 in. maximum. Dimension D may also be shortened by
cutting the pipes provided in the kit to 12 in. minimum.
*
The plenum should be constructed 1/4 in. smaller in width and depth than the plenum dimensions shown above.
PART NO. A
*
B C D† E F
KGAVT0501CVT 33-3/8 2 3-1/2 16-5/8 6-1/4 5-3/4
KGAVT0601CVT 38-7/8 3 4-1/2 21-1/8 7-3/8 6-1/2
FURNACE
CASING
WIDTH FURNACE IN DOWNFLOW APPLICATION
PLENUM OPENING
*
FLOOR OPENING HOLE NO.
FOR WIDTH
ADJUSTMENTABCD
17-1/2
Furnace with or without CD5 or CK5 Coil
Assembly or KCAKC Coil Box
15-1/8 19 16-3/4 20-3/8 3
21
Furnace with or without CD5 or CK5 Coil
Assembly or KCAKC Coil Box
18-5/8 19 20-1/4 20-3/8 2
C IN. DIA
B IN. DIA PVC
VENT/EXHAUST
1
3
/16
B IN. DIA PVC
INTAKE/COMBUSTION AIR
D
E
F
A
1
1
/2
A88207
LOCATING
TAB
LOCATING
TAB
1
2
3
4
4
3
2
1
B
D
A97427
ACCESSORY DOWNFLOW SUBBASE
Disassembled Assembled
C
A
1
1
/
4
″ TYP
PLENUM
OPENING
FACTORY-SUPPLIED
FIELD-INSTALLED
INSULATION
A97110