BOILER FEED SYSTEM
DATE: 4/3/03
REP:2/1/99
1
Sectio
n
1
Installation Instructions –
Boiler Feed System
Note: Please read the entire instruction manual before attempting installation.
Insurance and local or state regulatory codes may contain additional or more stringent
requirements than those contained in this manual. Installation must conform to these codes and
any other authority having jurisdiction.
Appropriate sections of the National Electric Code and ASME Code should be consulted and
followed.
1.1 FOUNDATION
Before uncrating, the location should be prepared. The boiler feed system should set upon a good
level concrete floor. If the unit is not level or the floor is not in good condition, a concrete
foundation should be built, the dimensions being larger than the outside dimensions of the boiler
feed system base.
1.2 CLEARANCES
NOTE
Adhere to all applicable local codes and NEC regarding system feed system installation and
clearances.
The unit may need room for service accessibility and clearances for piping and electrical
connections. Local codes must be applied to specific installations and the minimum clearances
established accordingly. If an electrical panel is supplied, the NEC requires a 36” service
entrance in front of the electrical panel.
1.3 UNCRATING THE BOILER FEED SYSTEM
Leave the packaging material used for crating in place until ready for installation. The crating is
not designed for outdoor storage; therefore the unit should be stored inside. Uncrate the boiler