Manual 2100-518B
Page 1 of 30
WARNING: After ushing is complete, but prior to pump motor start-up, loosen the large screw in
the center of the pump motor(s) to allow air to escape. Once water has seeped out around the screw,
re-tighten. Failure to perform this step will likely result in premature pump motor failure!
PUMP MOTOR REPLACEMENT: Bard Part #8300-003 (UP26-99F)
Manual: 2100-518B
Supersedes: 2100-518A
File: Volume I, Tab 8
Date: 04-23-12
INSTALLATION
INSTRUCTIONS
DOUBLE O-RING
GEOTHERMAL
FLOW CENTERS
Models:
DORFC-1 DORFC-2
BMC, Inc.
Bryan, Ohio 43506
DORFC-1 DORFC-2