For a 600Y/347V or higher three-phase wye panel with potential
transformers with the 120V variant of the meter:
Connect meter terminal A to the voltage disconnect phase A (red wire)
Connect meter terminal B to the voltage disconnect phase B (black
wire)
Connect meter terminal C to the voltage disconnect phase C (blue wire)
Connect meter neutral terminal to neutral bar in the voltage disconnect
panel (white wire)
Connect earth wire to earth post using lug provided
Install power supply shorting jumpers (see Figure 10)
NOTE: For the wiring of the potential transformers, see Figure 5.
Figure 10: PowerLogic EM4800 meter 600Y/347V or higher three-phase
wye service with potential transformers connection
Legend:
1 BX cable
2 Earth
3 Phase C (blue)
4 Phase B (black)
5 Shorting jumper
6 Sense voltage terminal block (J3)
7 Neutral (white)
8 Phase A (red)
9 0.75-inch (1.9-cm) strain relief
8
4
7
5
6
2
1
3