![](https://pdfstore-manualsonline.prod.a.ki/pdfasset/4/51/451b96dd-2540-42ad-a94a-fd4a73dac21b/451b96dd-2540-42ad-a94a-fd4a73dac21b-bg9.png)
1
1
Topspin 360 Quick Start
This document describes the basic steps required to install and configure the Topspin 360 system.
• “Requirements” on page 1
• “Topspin 360 Package Contents” on page 1
• “Prepare the Site” on page 2
• “Install Topspin 360 FRUs” on page 2
• “Rack the Topspin 360” on page 3
• “Boot your Topspin 360 and Configure Basic Connectivity” on page 9
• “Connect InfiniBand Hosts” on page 11
• “Install the Element Manager (GUI)” on page 14
• “Configure the System Clock” on page 15
• “Launch Chassis Manager” on page 17
Requirements
To install the Topspin 360 into a rack, you require the following:
• one #1 and one #2 Phillips-head screwdriver
• one management workstation, such as a PC running terminal-emulation software
• the chassis cable kit (included)
• two people to lift the unit into the rack
Topspin 360 Package Contents
The following items arrive in your Topspin shipment: