2.1.3 Installation and Commissioning Checklist
• Insulated Phillips and flathead screwdriver sets
• Insulated wire & cable strippers/crimpers (for ground lug, DC cable, alarm, and GMT cable
installations)
• 8mm socket or wrench for ground cable installation
1
2.1.3 Installation and Commissioning Checklist
• AC/DC system shelf mounted securely in rack
• 1 RU Distribution Shelf mounted securely in rack directly above the system shelf (if applicable)
• AC and DC cabling meets local and national electrical code specifications
• Installation in ETSI racks allows for front-to-back ventilation and the use of a ventilated door and
cabinet top
• System alarm cabling is installed and secure
• Power cables are secure and installed correctly
• Rectifiers are installed and seated correctly in the system shelf
• The controller and 1 RU Distribution faceplates are installed and secure (if applicable)
• System shelf rear cover is installed and secured
• System powers up and all red LEDs are extinguished after a few minutes
2.1.4 Installation Materials
Table 2-1 and Table 2-2 list the Cisco supplied installation materials that ship with the Cisco AC/DC
Power System. Table 2-3 lists materials that will need to be furnished at the install location.
Table 2-1 Supplied Materials for the System Shelf
Description Qty Use
M6 0x20mm screw (thread forming) 6 Shelf mounting screws (ETSI racks/cabinets)
12-24 x1/2” screw (thread forming) 6 Shelf mounting screws (ANSI, IEC racks/
cabinets)
M6 cage nut 6 Shelf mounting nut (ETSI racks/cabinets)
Mounting bracket 600mm ETSI rack 2 Ear mounts (ETSI racks/cabinets)
2A GMT fuse 2 GMT fuse panel
5A GMT fuse 2 GMT fuse panel
10A GMT fuse 2 GMT fuse panel
15A GMT fuse 2 GMT fuse panel
Standard AC plug 4 AC plugs that meet local requirements
Cable ties 12 Securing cables
ESD wrist strap 1 ESD protection