Windsor 10066250 Vacuum Cleaner User Manual


 
MACHINE OPERATIONS
86221970 17” SCRUBBER 01/03/07
3-7
PRE-RUN MACHINE INSPECTION
Do a pre-run inspection to find possible problems
that could cause poor performance or lost time from
breakdown. Follow the same procedure each time to
avoid missing steps.
NOTE: See maintenance section for pre-run
machine inspection checklist items.
FILLING SOLUTION TANK
FOR SAFETY: Before leaving or servicing
machine; stop on level surface, turn off machine.
1. Turn the machine off.
2. Remove solution tank cover.
3. Fill the solution tank with clean water, leaving
enough room for the required amount of
cleaning solution. The solution tank capacity is
8 gallons (30.3 liters). The water must not be
hotter than 140° F (60°C) to prevent damage to
the tank.
4. Measure the chemical into the solution tank.
Liquid chemicals should be added to the solution
tank after filling with water. Dry chemicals
should be thoroughly mixed before being added
into the solution tank. Commercially available,
high alkaline floor cleaners are suitable for use
in the solution system.
NOTE: Read the chemical manufacturers
recommended proportion instructions.
5. Replace solution tank cover.
Flammable materials can cause an explosion or
fire. Do not use flammable materials in the
tanks.
NORMAL SCRUBBING
Plan the scrubbing pattern in advance. The longest
track is around the perimeter of the area to be
cleaned. For efficient operation, the runs should be
the longest possible without turning, stopping, or
raising and lowering scrub brush/squeegee.
NOTE: In order to achieve the best possible results,
the area that is to be cleaned should be swept
before scrubbing. Large debris, strings & wire must
be removed to prevent being caught in the brush or
squeegee.