MACHINE OPERATION
SCEX364 86037160 03/12/07
3-11
DOUBLE SCRUB
For floors which are heavily soiled or have thick
accumulations of floor finish may not clean
sufficiently with one pass. In these cases it will be
necessary to double scrub.
To double scrub, make the first pass over the
surface being cleaned with both squeegees up,
vacuum off, the solution on and brushes down. This
allows the
solution to stay in contact with the soil
while loosening the surface accumulation with the
brushes. Allow time for the first application to stay in
contact with the floor. Length of time between the
first and second pass depends on amount of
accumulation and the type of chemical being used.
A second scrubbing with both squeegees down and
again the solution and brushes on will further loosen
soil. The additional application of solution will further
assist the difficult cleaning job.
FOR SAFETY: When using machine, go slow on
inclines and slippery services.
EMPTYING AND CLEANING TANKS
1. Park the machine next to a floor drain. Drain
hose is on left rear corner of the machine.
2. Turn the machine power off and set parking
brake.
SOLUTION TANK
1. Loosen small drain hose from the retainer, then
lower hose in direction of the drain.
2. Remove the solution tank cover.
3. Flush the solution tank out with clean water and
run several gallons of clean water through
systems. Do not use water hotter than 140°F
(60°C) to clean tank. Damage may occur.
NOTE: Never allow solution to remain in tank.
Damage to tank, seals and valves could occur.
4. Secure drain hose into the retainer.
RECOVERY TANK
1. Unhook the large drain hose from the retainer.
Lower hose in direction of the drain then
unscrew the T-handle on plug enough to loosen
plug. Do not stand in front of end of hose.
Recovered solution will come out with force.
Slowly remove plug from drain hose.
2. Remove the recovery tank dome. Flush the
recovery tank out with clean water. Do not use
water hotter than 140°F (60°C) to clean tank.
Damage may occur.
3. Clean off the float shut-off system and inspect
for free movement of float. The float shut-off
system is located in the rear of the recovery
tank.
4. Replace the drain plug and secure drain hose in
bracket.
5. If machine is to be stored, leave the recovery
tank dome off.
TANK COVER
RECOVERY
TANK COVER
SOLUTION
SOLUTION
TANK DRAIN
TANK DRAIN
RECOVERY