Weil-McLain GV Series 3 Boiler User Manual


 
Part number 550-110-266/0601
7
GOLD GV Series 3 & 4 — Z-Vent II Venting Supplement
Installation — assembly continued
Figure 8 Sidewall termination installation (non-direct venting)
Figure 9 Non-direct vent through sidewall
(using termination coupling) Follow Z-Vent II
manufacturer’s instructions for proper installation of
vent runs, including slope and support.
Figure 10 Non-direct vent through roof
Follow Z-Vent II manufacturer’s instructions for proper
installation of vent runs, including slope and support.
26604b
Z-Vent II
vent starter tee
26605b
Z-Vent II
vent starter tee
26609
¼" to ¾" between stop
on termination and
metal plate
4" galvanized sleeve
(through 4 " hole for
wall)
¹⁄₈
combustible
Spacers (2)
(to support and
center vent in
sleeve)
Spacers (2)
(to support and
center vent in
sleeve)
Termination coupling
Sealant
Sealant
Pipe section
Pipe section
Metal plate
Metal plate