RTAC-SVX01F-EN 29
Installation - Mechanical
Storage
Extended storage of the outdoor unit prior to installation requires the following pre-
cautionary measures:
1. Store the outdoor unit in a secure area.
2. At least every three months (quarterly), check the pressure in the refrigerant cir-
cuits to verify that the refrigerant charge is intact. If it is not, contact a qualified
service organization and the appropriate Trane sales office.
3. Close the discharge and liquid line isolation valves.
General
Report any damage incurred during handling or installation to the Trane sales office
immediately.
Location Requirements
Setting the Unit
A base or foundation is not required if the selected unit location is level and strong
enough to support the unit’s operating weight as listed in
Table 1 through Table 5 in
the General Information section.
See Table 6 for lifting weights and center of gravity (CG) dimensions.
Figure 14 Lifting the Unit (Package and Remote) 15-21-foot Base
1. Lifting chains/cables will not
be the same length. Adjust to keep unit level while lifting.
2. Do not fork lift unit.
3. Weights are typical for units with R-134a charge.