Toshiba RAV-SP1404AT8ZG-E Air Conditioner User Manual


 
– 128 –
No.
10
Part name
Compressor
Compressor lead
(Continued)
Procedure
2. Mounting of compressor
1) Mount the compressor in the reverse
procedure for removal.
NOTE
After replacement of the compressor, be sure
to replace the compressor lead. (Repair part
code of compressor lead: 43160612)
In this time, wrap the ferrite core with the
compressor lead wire by 1 time.
As shown in the right figure, mount the
sound-insulation plate (rolling in, rolling out)
by passing through it between the
compressor and the piping, and between the
piping and the partition board.
Fix TD sensor by the bundling band for heat-
proof on the market via the pipe cover so that
TD sensor does not directly come to contact
with the discharge pipe.
3. Vacuuming
1) Connect the vacuum pump to the charge
port and the check joint of the gas pipe valve
and then drive the vacuum pump.
2) Carry out vacuuming until the vacuum low
pressure gauge indicates 1 (mmHg).
NOTE
Before vacuuming, open PMV fully.
If PMV is closed, vacuum may be impossible
between liquid pipe valve and PMV of the
outdoor unit.
Forced full-opening method of PMV
Turn on the leakage breaker.
Turn on 1 and 3 of Dip switch SW804 on the
control P.C. board of the outdoor unit.
Keep pushing SW801 on the control P.C. board of
the outdoor unit for 1 second or more.
After pushing SW801 for 1 second or more, turn
off the leakage breaker within 2 minutes.
4. Refrigerant charge
1) Add the refrigerant amount determined by
the pipe length from the charge port of the
valve.
Remarks
Wrap the ferrite core with the compressor
lead wire for 1 time.
There should be no clearance between
sound-insulation plate (upper) and sound-
insulation plate (rolling out).
Cultural rivet
Cultural rivet
Insert one side
Insert one side
Sound-insulation plate
Sound-insulation plate
(rolling out)
(rolling out)
Sound-insulation plate
(upper)
Cultural rivet
Insert one side
under cultural rivet.
Sound-insulation plate
(rolling out)
Pass through sound-
insulation plate
(rolling out) between
suction pipe and
header pipe.
Put the end of
sound-insulation
plate (rolling out)
on the other end
at this position.
Header pipe
Header pipe
Suction pipe
Suction pipe
Discharge pipe
Discharge pipe
Discharge pipe
Pass through sound-insulation plate
(rolling in) between compressor and
discharge pipe, suction pipe and then put
the end of sound-insulation plate on the
other end at this position.
Header pipe
Suction pipe
Compressor lead
Compressor lead
Ferrite core
Ferrite core
Ferrite core
0 to 50
(Compressor lead positioning standard)
0 to 50
0 to 50
0 to 50
Compressor lead
SW804
SW801