Toshiba HWS-1402XWHT6-E Heat Pump User Manual


 
140
Toshiba
5 Fan motor 1)Perform the step 1-1 and step 2.
2)Remove the fan motor and the flange nut that fixes
the propeller fan.
To loosen the flange nut, turn it clockwise.
(Turn it counterclockwise for tightening.)
3)Remove the propeller fan.
4)Remove the connector for fan motor from the
inverter. (control board)
5)Remove the fan motor lead from the fan motor
lead fixing rubber on the through hole of the
parting board.
6)Remove the fixed screws (4 for each) while
holding the fan motor so that it does not drop.
* Notes in assembling fan motor
Tighten the flange nut in 4.95 N•m (50kgf•cm)
To prevent the fan motor lead from contacting
the propeller fan, adjust the length of fan motor
lead fixing rubber so that it does not slack.
Attach the fan motor lead fixing rubber to the
parting board so that the projection part is
placed on the refrigerant cycle side.
Make sure that the reactor body and the fan
motor lead do not contact each other.
Be sure to bind the removed binding tie by
using the commercially available binding tie.
Note
Fix the fan motor lead to the motor base using a
metal tie so that the fan motor lead does not
contact the propeller fan.
No.
Exchange parts
name
Work procedure Remarks
Propeller fan
Fan motor
fixing rubber
Fan motor
Fan motor
Inverter
Turn it right to loosen
Flange nut
Propeller fan
Projection/Refrigerant
cycle side
Fan motor connector
+00A09-002_01EN_SVM_ALL_Air_to_Water.book Page 140 Monday, October 5, 2009 2:09 PM