8.2. Fill ing up the dry ing cells
L
At de liv ery the dry ing cells are not filled with dry ing agent.
F
Be fore fill ing up check that the screw con nec tion (B) is mounted.
Re move the ten sion ring and the tin plate
(A).
Fill the dry ing cell with dry ing agent up to
the noz zle (see fill ing level).
Mount the tin plate and the ten sion ring (A).
F
Check 4-5 hours af ter first putt ing into op er a tion the fill ing level in the
dry ing cells, if nec es sary fil up dry ing agentl
036-2MS
STT 1600
As sem bly in struc tions 8-3
AA
BB
Füllstand
T rocknungsmittel
Filling level
drying agent
Dry ing cell