SPX Cooling Technologies F400 Fan User Manual


 
12
Spare Parts
SPX Cooling Technologies manufactures and maintains a stock of re-
placement parts for all cooling tower mechanical equipment. Shipment of
these parts are normally made within ten days after an order is received.
If emergency service is necessary, contact the local Marley representative
for assistance.
To prevent prolonged shutdown periods in case of damage to the me-
chanical equipment, it is suggested that the following parts be carried in
the owner’s stock:
• One fan assembly.
• One Geareducer assembly.
• One drive shaft assembly.
Be sure to furnish the tower serial number when ordering parts.
Seasonal Shutdown Instructions
Tower–Drain all tower piping.
During shutdown, clean the tower and make any necessary repairs. Ap-
ply protective coating as required to all metal parts. Particular attention
should be given to mechanical equipment supports, drive shaft and drive
shaft guards.
Mechanical Equipment
Geareducer (shutdown for 3 months or less).
1. Each month, drain water condensate from the lowest point of the
Geareducer and its oil system. Check oil level and add oil if necessary.
Operate to recoat all interior surfaces with oil.
2. At start-up, drain water condensate and check oil level. Add oil if nec-
essary.
Refer to Geareducer User Manual for maintenance and lubrication in-
structions.