Soleus Air KFHHP-22-ID Air Conditioner User Manual


 
- 18 -
Installation
Install the Power Line
1. Remove the front side plate.
2. Break through the hole for wires and put on the rubber bushing.
3. Pull all wires through the rubber bushing.
4. Remove the wire clamp and connect the end of the power connection cord with screws to the
wiring terminal board according to the “WIRING DIAGRAM” of the outdoor unit.
5. Make sure that the wiring has been connected properly.
6. Tighten the wire with clamp and clasp.
7. After the wiring crosses through the Connector, tighten the Connector with the fix nut.
Install the Indoor Unit
1. When routing the piping and wiring from the left or right side of the indoor unit, cut off the
tailings from the chassis as necessary (shown in Fig.3).
Cut off tailing 1 when only power cord is routed.
Cut off tailing 1 and 2 when connect pipe and power cord are routed.
2. Wrap the piping and wiring and pull them through the cut-off tailings hole (shown in Fig.4).
3. Hang the 2 mounting slots of the indoor unit on the upper tabs of the rear panel and check that it
is securely fastened.
4. The height of the installed location should be 7.55 feet or more from the floor.